ORANGE LINE BUS RAPID TRANSIT PROJECT
Los Angeles, CA

Duration
2005 - 2006

Owner / Client
LA Metro / Shimmick Construction

Project Type
Busway Design-Build

Cost
$324 MIllion

V&A, Inc. served as the lead Project Engineer for the Street Improvements Group, which was responsible for designing the horizontal and vertical alignment of intersections along a new 13.1-mile two-lane Metro bus highway. The scope of work for this design-build project also entailed the utility and drainage design coordination and the preparation of the 60%, 85%, 100%, and AFC packages. Through weekly coordination meetings with LABOE and Metro and productive interaction with LADOT, LABOE, LABSL, and LADWP, V&A Inc. facilitated project delivery, on schedule and within budget.