I-405 Sepulveda Pass Express Lanes Project – PA/ED

The contract objective is to prepare a Project Approval and Environmental Document (PA/ED) and Concept of Operations (ConOps) for implementing Express Lanes (High Occupancy Toll Lanes, or HOT Lanes) on I-405, both directions, between I-1- and US-101, one of most busiest and congested freeways in the US.

V&A Inc. role in the project is related to: i) Design constraints analysis (environmental, traffic, and utility considerations on conceptual design), ii) Project Engineering (impacts on utilities, traffic control plans, construction staging of different alternatives). This includes horizontal and vertical alignments, typical sections, construction staging/detours and building plans. Geometric plans for the three build alternatives.