Orange Line Bus Rapid Transit
- Los Angeles, CA
- Duration 2005 - 2006
- Owner / Client LA Metro / Shimmick Construction
- Project Type Busway Design-Build
- Cost $324 MIllion
V&A, Inc. served as the lead Project Engineer for the Street Improvements Group, which was responsible for designing the horizontal and vertical alignment of intersections along a new 13.1-mile two-lane Metro bus highway.
The scope of work for this design-build project also entailed the utility and drainage design coordination and the preparation of the 60%, 85%, 100%, and AFC packages.
Through weekly coordination meetings with LABOE and Metro and productive interaction with LADOT, LABOE, LABSL, and LADWP, V&A Inc. facilitated project delivery, on schedule and within budget.